Foundation Works Risk Assessments

Foundation works risk assessments are required to ensure that foundation construction works do not create a new contamination migration pathway where elevated levels of contamination have been recorded.

Piled foundation works risk assessments are undertaken in accordance with Environment Agency guidance to ensure that no new contamination migration pathways are created potentially linking near surface contaminated soils to underlying groundwater.  

Case Study

Foundation Works Risk Assessment Allows Development to Proceed

Ruddlesden geotechnical were commissioned to undertake a Foundation Works Risk Assessment for a proposed commercial development within the centre of Cirencester.

Case Study

Materials Management Plan Avoids Unnecessary Landfill Disposal

Ruddlesden geotechnical produced a Materials Management Plan (MMP) in accordance with CL:AIRE Definition of Waste (DoW): Code of Practice (CoP) for the movement of topsoil from a donor site to a receiver site.